Franchise owners are ready to run a business, not a modular buildout. Permitting, factory coordination, and delivery logistics can each cost weeks if nothing's managing them.
Boost Coffee locations are modular. Each one is built by Russo, Boost Coffee's modular manufacturer, and shipped to your site instead of framed on location.
Realm manages that process for Boost Coffee franchisees, from site and permitting through delivery and installation, so your opening date doesn't depend on you managing two separate timelines yourself.
We act as your guide through site and permitting readiness, factory coordination with Russo, delivery logistics, and installation oversight. We protect your timeline, your budget, and your momentum.
CLARITY BEFORE COMMITTMENT
Know what your site and your timeline actually require before your buildout begins.
FASTER PATH TO OPEN
Start the right way and avoid the delays that come from mismatched schedules.
PROTECT YOUR CAPITAL
Avoid storage costs and change-order surprises when the factory and site schedules don't line up.
EXPERIENCED GUIDANCE
You don't have to coordinate a factory and a job site alone.

Get your site and local approvals moving in parallel with production, including inspections some jurisdictions still treat as new territory for modular buildings.
Stay in sync with Russo's build schedule so nothing arrives before, or after, your site is ready to receive it.
Manage the permits, routing, and scheduling that come with shipping a full-size modular unit.
Oversee the set, utility connections, and final inspections that turn a delivered module into an open location.
Yes. Realm coordinates directly with Russo throughout production and delivery so the factory timeline and the site timeline stay in sync.
Not for the building itself, since Russo manufactures it off-site. You'll still need local site work such as foundation and utility connections, which Realm coordinates as part of the process.
A modular buildout runs two schedules at once: factory production and local site preparation. The risk shifts from managing multiple trades to keeping those two timelines aligned, along with permitting offices that don't always handle modular construction routinely.